Purpose: the complex is designed for the preparation of concrete, mortar and foam concrete.
Advantages: the developed layout scheme of the complex allows to reduce the metal consumption of the structure and reduce the size of the installation. The system of two-stage dosing of components allows you to prepare higher-quality concrete mixes, prevent overspending of materials, and reduce electricity consumption.
Main characteristics: capacity - 30-250 m3 per hour.
Developers: Leonovich S.N., Doctor of Engineering Science, Professor, Gurinovich V.Y., Olgomets A.I., Karpovich S.L.