Проекты en

23.06.2023

Automated control system of mini-CHP, RTS-8 UP "Minskkommunteploset", Minsk


23.06.2023

Automated control system of the boiler house, RTS-2 UP "Minskkommunteploset", Minsk


23.06.2023

RTS-1 UP "Minskkommunteploset", Minsk


23.06.2023

Automated control system of boiler house No. 3, City heating networks, Surgut


23.06.2023

Automated boiler room control system, RTS-7 UP "Minskkommunteploset", Minsk


23.06.2023

automated boiler room control system, RTS-1 UP "Minskkommunteploset", Minsk


23.06.2023

Automated system of commercial accounting of the boiler house, RTS-2 UP "Minskkommunteploset", Minsk


23.06.2023

automated control system of the boiler house "Kedyshko" Branch of MTS RUP "Minskenergo", Minsk


23.06.2023

Magnetofluidic damper


23.06.2023

Small-sized pulsed laser emitter with longitudinal pumping


23.06.2023

Regenerative chirped pulse amplifier based on Yb crystal:LuAP with diode pumping


23.06.2023

Measuring device for non-destructive non-contact characterization of semiconductor structures with submicron layers according to the parameters of the spatial distribution of lifetime and iron impurities in p-type silicon


23.06.2023

Free-form inertial navigation system of the new generation


23.06.2023

Technological line of laser thermal hardening of large-sized parts of heavy-duty vehicles. JSC "BELAZ"


22.06.2023

Suspended platform for lamp maintenance (Gomel Maltal and Normal Molders Plant)


22.06.2023

Diamond paste, diamond suspension, the technological process of polishing single-crystal silicon wafers are implemented at the branch "Kamerton"


21.06.2023

Information system for the diagnosis of skin melanoma by dermatoscopic image MelaSearch


19.06.2023

Software package for determining costs in the construction of a PC "SMR-W"


19.06.2023

Sandwich panel certification tests


19.06.2023

Testing of semi-arches with a span of 35 m for the object: "Construction of the GOK Nezhinsky field"